Adding and Configuring Components

1
three-phase
Voltage range
200-240 VAC,
phase to neutral,
47-63 Hz (EUR
typical)
4
five-wire 36A Marked
Electrical per
phase
No receptacle
required.
Electrician must
hardwire power to
the PDCA
b
2 three-phase Voltage range
200-240 VAC,
phase to phase,
47-63 Hz (US
typical)
four-wire 62 A Marked
Electrical per
phase
No receptacle
required.
Electrician must
hardwire power to
the PDCA
b
4 three-phase Voltage range
200-240 VAC,
phase to phase,
47-63 Hz (US
typical)
four-wire 62 A Marked
Electrical per
phase
Receptacle
provided.
Electrician must
hardwire receptacle
to site power
b
5
three-phase
Voltage range
200-240 VAC,
phase to neutral,
47-63 Hz (EUR
typical)
c
five-wire 36A Marked
Electrical per
phase
Receptacle
provided.
Electrician must
hardwire receptacle
to site power
b
A qualified electrician must wire the PDCA receptacle to site power using copper wire and in
compliance with all local codes.
Each branch circuit used within a Superdome Complex must be connected together to form a
common ground.
Do not install a PDCA that does not have one of the following set of labels attached.
Adding additional PDCAs
http://superdome-test.fc.hp.com/sd_web/content/00/0C/0P/idd/406.html (7 of 22) [03/01/2001 2:11:03 PM]