Adding and Configuring Components
Due to local codes, solid conductor or low count stranded cabling may be required to meet the
fill ratio and current/cable derating guidelines for multi-conductor cabling, as well as to pass
through the inside diameter of the strain relief or conduit coupling.
Figure 5 Cable Preparation Detail
Adding additional PDCAs
http://superdome-test.fc.hp.com/sd_web/content/00/0C/0P/idd/406.html (10 of 22) [03/01/2001 2:11:03 PM]










