Site Preparation Guide, Eighth Edition - Superdome HP 9000 Systems

Chapter 1
System Specifications
Upgrading Superdomes and Server Systems
9
Upgrading Superdomes and Server Systems
This section provides the details relating to upgrading a Superdome.
IMPORTANT Ensure that the customer is aware of the iCOD email requirements. That is, each bootable
partition requires a connection to the internet to send email to notify Hewlett-Packard that the
customer has allocated additional CPUs beyond the amount initially purchased. Each bootable
partition must be configured to perform this operation.
For more details, go to http://superdome.hp.com and click on the iCOD link.
Upgrading the Server
Space requirements remain the same, but power and cooling must be increased when upgrading within a
cabinet (adding additional cells, I/O, etc.).
Special attention should be given to the original circuit breaker and wiring sizes to ensure safety compliance
and margins are sill appropriate.
Identify and plan for future upgrades and expansions. It is cost effective to provide the cooling and power
capability now for potential future expansions.
Upgrading the System
Space, power, and cooling requirements must be considered and increased as necessary when upgrading a
Superdome (adding additional cabinets, cells, I/O, etc.).