Site Preparation Guide, Eighth Edition - Superdome HP 9000 Systems

Chapter 4
Pre-Installation Survey
Site Inspection
69
11. Are floor tiles in good condition and properly
braced?
12. Metallic particulate test required.
Power and lighting
No. Area or condition Yes No
13. Are lighting levels adequate for maintenance?
14. Are there ac outlets available for servicing
needs? (i.e. vacuuming)
15. Does the input voltage correspond to equipment
specifications?
15A Is dual source power used? If so, identify type(s)
and evaluate grounding.
16 Does the input frequency correspond to
equipment specifications?
17. Are lightning arrestors installed inside the
building?
18. Is power conditioning equipment installed?
19. Is there a dedicated branch circuit for
equipment?
20. Is the dedicated branch circuit less than 250
feet (72.5 meters)?
21. Are the input circuit breakers adequate for
equipment loads?
Safety
No. Area or condition Yes No
22. Is there an emergency power shut-off switch?
23. Is there a telephone available for emergency
purposes?
24. Is there a fire protection system in the
computer room?
25. Is antistatic flooring installed?
Table 4-2 Site Inspection Checklist (Continued)
Please check either Yes or No. If No, include comment or date
Comment
or Date