Site Preparation Guide, Eighth Edition - Superdome HP 9000 Systems

Chapter 4
Pre-Installation Survey
Site Inspection
70
26. Are there any equipment servicing hazards
(loose ground wires, poor lighting, etc.)?
Cooling
No. Area or condition Yes No
27. Can cooling be maintained between 68° and 86°
(20° and 30° C)?
28. Can temperature changes be held to 9°
(5 ° C) per hour?
29. Can humidity level be maintained between 40%
and 55%?
30. Are air conditioning filters installed and clean?
Storage
No. Area or condition Yes No
31. Are cabinets available for tape and disc media?
32. Is shelving available for documentation?
Training
No. Area or Condition
33 Are personnel enrolled in the System
Administrator’s Course?
34 Is on-site training required?
Table 4-2 Site Inspection Checklist (Continued)
Please check either Yes or No. If No, include comment or date
Comment
or Date