Superdome Servers - I/O Expansion Cabinet Guide, Fifth Edition
Chapter 4
Cabling
Routing the Cables
91
Step 9. Use channel brackets, tie slots, and tie-wrap anchors to secure cables that run along the rack
channels.
Figure 4-6IOX Channel Bracket
Routing the Rear ICE Cables
The rear ICE cables include:
• SBA (or REO)
•Clock
• Utilities
•Fan control
•DC Power
Step 1. Run all the cables listed above over the roller management arm.
Step 2. Insure that all cables have sufficient service loop.
Step 3. Secure each cable to the roller management arm with VELCOR cable ties.
Step 4. Secure the cables to the strain relief arm with VELCRO ties.










