Superdome Servers - I/O Expansion Cabinet Guide, Fifth Edition

Chapter 5
Adding an ICE to the IOX
Preliminary Installation
96
Preliminary Installation
The following is a list of tools required for ICE assembly and service operations:
Anti-static mat with provisions for connecting to chassis ground
Wrist strap
T-8, T-10, T-15, T-20, T-25 Torx bits
•Drive extension
#1 and #2 Phillips bits
Allen wrench set
Nut drivers set
6-inch crescent wrench
The IOX cabinet is shipped with at least one ICE. Additional ICEs, however, may be installed later.
The ICE may be mounted in one of three locations in the rack.
To install an ICE into the IOX cabinet:
Step 1. Remove the ICE from its shipping carton and inspect it for damage.
Step 2. Determine where the ICE is to be located.