Superdome Servers - I/O Expansion Cabinet Guide, Fifth Edition
Chapter 5
Adding an ICE to the IOX
Connecting the Cables
117
Step 2. Pass the cable from the back of the XUC, down the nearest rack channel, over the cable
management arm, under the cable strain relief arm of the newly installed ICE.
Figure 5-25Routing the Utilities Cable
Step 3. Locate the utilities connector on the back of the ICE. See Figure 5-11 on page 105.
4/13/01
60IOX065
See Detail A
Detail A
Detail B
I/O Bay 1 Signal
To Ice 1
I/O Utilities
(Typical)
To Ice 2
I/O Bay 2 Signa
l
See Detail B
To Ice 0
I/O Bay 0 Signal
Utilities Connector










