Superdome Servers - I/O Expansion Cabinet Guide, Fifth Edition
Chapter 1
Introduction
System Configurations
28
The required number of ICEs should be installed between the XPC and XUC/RDM. In this way, open rack
space for peripherals is maximized. The recommended loading order for a 1.6m rack is shown in Figure 1-22,
and the recommended loading order for the 1.96m rack is shown in Figure 1-23.
Figure 1-22 1.6 Meter Rack Loading
Figure 1-23 1.96-Meter Rack Loading










