Superdome Servers - I/O Expansion Cabinet Guide, Fifth Edition
Chapter 3
Installing the IOX
Unpacking the IOX
51
Figure 3-8Removing the Anti-Tip Stabilizer Feet
Step 8. Remove the power cord from the cabinet back rail by cutting the green tie-wraps on the rail and
removing the green VELCRO ties holding the cord.
NOTE Green tie-wraps and green VELCRO ties secure the cables during shipment. They
should be removed when installing the IOX. The black tie-wraps and VELCRO ties
should not be removed.
Figure 3-9Removing the Power Cord










