Superdome Servers - I/O Expansion Cabinet Guide, Fifth Edition
ix
WARNING Please note the following conditions of installation:
Install a PE (protective earthing) conductor that is identical in size, insulation
material, and thickness to the branch-circuit supply conductors. The PE conductor
insulation must be green with yellow stripes. The earthing conductor is to be
connected from the unit to the building installation earth or, if supplied by a
separately derived system, at the supply transformer or motor-generator set
grounding point.
WARNING NORDIC Class 1 Equipment
Denmark: Før tilslutning af de øvrige ledere, se medfølgende
installationsvejledning.
WARNING NORDIC Class 1 Equipment
Sweden: Apparaten skall anslutas till jordat uttag, när den ansluts till ett nätverk.
Multiple Power Sources and Cords
This equipment may be configured with dual-input line sources. Hazardous voltages and energy may be
present even after the removal of a single input source. Trained service personnel must follow the guidelines
stipulated in the Service Guidelines section of the Superdome EPSS.
WARNING Remove both input power sources before replacing an internal fuse.
WARNING If the system has two PDCA installed, ensure that power is removed from both PDCA
before removing fuses.
Lithium Battery Caution
WARNING Observe the correct polarity when changing the lithium battery. There is a danger of
explosion if battery is installed incorrectly.
Replace only with the same or equivalent type recommended by the manufacturer.
Dispose of used batteries according to the manufacturer’s instructions and local
disposal requirements.