HP Surestore Bridge FC 2/1 LV and FC 4/1 HV Installation and Operations Guide

18 Operation Indicators Chapter 1
Operation Indicators
The bridge is equipped with back panel LED indicators for monitoring overall
status.
Figure 6 HP Surestore Bridge FC 2/1 LV LED Indicators
The LED functionality of the FC 2/1 LV is as follows:
Power - This green indicator turns on when power is applied to the bridge.
Fault - This green indicator illuminates during power-on self test (POST),
then remains dark unless the bridge experiences a processor problem.
Fibre Channel - This green indicator signifies Fibre Channel activity when
lit.
Ethernet - This green indicator signifies Ethernet activity when lit.
Bus 0 - This green indicator signifies SCSI 0 activity when lit.
SCSI Bus 1 - This green indicator signifies SCSI 1 activity when lit.
Term 0 - This green indicator signifies internal SCSI termination is enabled
for SCSI Bus 0.
Term 1 - This green indicator signifies internal SCSI termination is enabled
for SCSI Bus 1.