HP Surestore Bridge FC 2/1 LV and FC 4/1 HV Installation and Operations Guide
Chapter 1 Operation Indicators 19
Chapter 1
Figure 7 HP Surestore Bridge FC 4/1 HV LED Indicators
The LED functionality of the FC 4/1 HV is as follows:
■ Power - This green indicator turns on when power is applied to the bridge.
■ Fault - This green indicator illuminates during power-on test (POST), then
remains dark unless the bridge experiences a processor problem.
■ Fibre Channel - This green indicator signifies Fibre Channel activity
when lit.
■ Ethernet - This green indicator signifies Ethernet activity when lit.
■ SCSI Bus 0 - This green indicator signifies SCSI 0 activity when lit.
■ SCSI Bus 1 - This green indicator signifies SCSI 1 activity when lit.
■ Bus 2 - This green indicator signifies SCSI 2 activity when lit.
■ Bus 3 - This green indicator signifies SCSI 3 activity when lit.
Note There are no internal terminator LED indicators on the FC 4/1
bridge, as it is always internally terminated.