HP Surestore Bridge FC 2/1 LV and FC 4/1 HV Installation and Operations Guide

56 Installing the HP Surestore Bridge Chapter 3
Installing the Fibre Bridge in the Rack
Note The bridge is mounted into the back of the rack, front access to
the bridge is not required.
1. Facing the back of the rack, install a total of four clip nuts, two on the left
rail and two on the right rail, above any existing product.
2. Install the clip nuts so that the top nut aligns with the top hole of the
L-bracket and the bottom clip nut aligns with the bottom hole (see Figure
19 on page 57).
To ensure level mounting, verify that the clip nuts are in the same position
on the right and left rails.
3. Holding the bridge in position, align the holes in the mounting brackets
with the holes in the clip nuts, and install the indicated screws into the clip
nuts and hand tighten.
4. After the bridge is in place, tighten all screws.