fw 05.01.00 and sw 07.01.00 - Universal Port Module Kit - Installation Instructions

Installation Instructions
18 Universal Port Module Kit Installation Instructions
Touch the chassis once before performing any maintenance action, and once each
minute while installing UPMs.
Figure 3: ESD grounding point (rear)
Removing the UPM Filler Blank
Use the following procedure to remove a UPM filler blank. Filler blanks cover and
protect unused UPM card slots in the director chassis. A list of required tools is
provided.
Required Tools
The torque tool and hex adapter (provided with the director) are required to
perform the installation procedures.
Removal
To remove a filler blank:
1. Unlock and open the cabinet front door if the director is rack-mounted and
installed in a custom equipment cabinet. If the director is installed in a
stand-alone configuration, go to step 2.
2. Identify the filler blank to be removed.
1 ESD Grounding Point
SHR 2300
1