fw 05.01.00 and sw 07.01.00 - Universal Port Module Kit - Installation Instructions
Installation Instructions
20 Universal Port Module Kit Installation Instructions
Figure 5: Director 2/140 UPM filler blank removal
4. Pull the filler blank out and remove it from the director chassis.
Installing the UPM Card
Use the following procedures to install a UPM card. A list of required tools is
provided.
Required Tools
The following tools are required to perform these procedures.
■ ESD grounding cable and wrist strap.
■ Torque tool and hex adapter (provided with the director).
■ Fiber optic protective plugs (provided with the director).