Service and User Manual (Short- and Long-Wave)

Installation
21
2 INSTALLATION
Overview
Procedure 1: Prepare to Install the Hub
Procedure 2: Unpack the Hub
Procedure 3: Verify Hub Operation
Procedure 4: Mount the Hub into a Rack (Optional)
Procedure 5: Plan the FC-AL Connections
Procedure 6: Connect FC-AL Devices
Procedure 7: Verify the Connections