Service and User Manual (Short- and Long-Wave)

Procedure 1: Prepare to Install the Hub 23
Installation
Procedure 1: Prepare to Install the Hub
Before installing the hub:
Complete site-required arrangements for the hub.
Make sure electrical power and temperature control requirements are met.
Define a strategy for integrating the hub into an existing loop.
Draw a map of all nodes to be connected to the hub.