HP StorageWorks 200 Storage Virtualization System site preparation guide (AE071-96003, October 2006)

Site prep che
cklist
The checklist below helps you comprehensively plan for delivery and installation of the HP SVS200
system. Chec
klist items that require a “Yes answer are marked with asterisks (*) .
Customer summary
Customer:
Date:
Address:
Contact:
Phone:
HP representative:
Phone:
Safety Yes No Reference
Is there a re protection system in the
computer room?
Fire safety
Is the computer room free of any
equipment servicing hazards (for
example, electrical or data cables that
obstruct access)?
Equipment servicing hazards
Is the exi
sting oor plan documented?
Space planning requirem ents
Has a new oor plan been developed
to include the new system?
Space planning requirem ents
Does the new oor plan include
adequate space for airow and
servicing needs?
Floor clearance and cutout dimensions
Does the
new oor plan include the
clearan
ce required for the oor’s load
rating?
Floor clearance and cutout dimensions
Is the computer room structurally
complete (walls, oor, air conditioning
system, and so on)?
General computer room requirements
Is the raised oor adequate for the
equipment load?
Raised oor requirements
Is antistatic ooringormatsinstalled?
Preve
nting electrostatic discharge
Are there cutouts or channels for cable
routing?
Floor clearance and cutout dimensions
Is there a dedicated analog telephone
line for phone home” conguration?
Data comm requirements
Is a telephone line available for HP
representative use?
Data c
omm requirements
Is an ethernet LAN available so that
the system can be connected to your
intranet?
Data comm requirements
Can the temperature be maintained
between 16 and 32 degrees C?
Temperature specications
Can
temperature changes be held to
le
ss than 10 degrees C per hour?
Temperature specications
Can the humidity leve l be maintained
between 20% and 80%?
Humidity specications
HP StorageWorks 200 Storage Virtualization System site preparation guide