HP StorageWorks 200 Storage Virtualization System site preparation guide (AE071-96003, October 2006)

Is the computer room protected against
dust, pollution, and metallic particulate
contamination?
Dust and pollution controlMetallic
particulate contamination
Does the computer room support other
environmental c on siderations (such as
vibration and acoustics)?
Environmental requirements
Acoustics
Are sufcient AC outlets, on different
lines, available for the equipment?
Electrical requirements
Doestheinputvoltagecorrespondto
the e quip ment specications?
Electrical requirements
Are the inpu
t circuit breakers adequate
for equipme
nt loads?
Electrical
requirements
Does the input frequency correspond to
equipment specications?
Electrical requirements
Is an appropriate uninterruptible power
supply (UPS) strategy in place?
Uninterruptible power supply (UPS)
If lightning arresters are recommended,
are they installed?
Protection against sources of electrical
interfer
ence
Have all sources of electrical
interference been corrected?
Protection against sources of electrical
interference
Does the customer site have
access control (for example, do
HP representatives need an escort)?
N/A
Does the computer room have
access control (for example, do HP
representatives need a security code)?
N/A
Are all oors, stairs, elevators,
stairwalkers,lifts,ramps,orladders
needed to m ove the equipment
adequate to support its weight and
size?
Dimensions and weights
Component weights
Will the equipment t through all doors
and corridors and in lifts?
Dimensions and weights
Doesthebuildinghavealoadingdock?
Maximum access height is _____m.
Dimensions and weights
Additional equipment N/A
For any additional equipment required
(for example, connectors, receptacles,
cables, and any equipment not supplied
by HP), is the equipment on site and
ready for use?
N/A
12
Site prep team and tasks