HP StorageWorks 200 Storage Virtualization System site preparation guide (AE071-96003, October 2006)
Calculating c
learances
The total floo
r clearance required for the system includes:
• Theactualspacerequiredbytheequipment.
• Service clearance — the floor space required to access the system. Never use this space for
storage.
• Additional space required to properly distribute the equipment weight on your computer room’s
raised floor. The amount of add itional space required depends on your floor load rating.
HP StorageWorks 200 Storage Virtualization System site preparation guide
25