HP StorageWorks 200 Storage Virtualization System site preparation guide (AE071-96003, October 2006)

Rack clearanc
enotesandoor loading
The followin
g notes apply to the preceding rack dimensional gures.
Note *1: Clea
rance (a+b) depends on the oor load rating and clearance c”. Required clearances
for various
oor load ratings are shown below.
Required clearance (a + b) mm
Clearance (c) mm
Floorload
rating (kg/
m2)
c = 0 c = 200 c = 400 c = 600 c = 1000
500 100 0.00 0.00 0.00 0.00
450
200 100 100 0.00 0.00
400
300 200 200 100 0.00
350 500
400
300 300 200
300 900 700 600 500
400
Provide 100 mm of clearance on both sides of the system when the kick plates are to be attached after
the system is installed. When systems of the same type are to be installed adjacent to each other,
clearance between the systems m ay be 100 mm.
Addition
al notes on rack oor loading and clearances:
Decide actual clearances in consultation with the construction specialist responsible for installation.
They may
vary depending on the size and layout of the system and building conditions.
When multiple systems are arranged in a row, base your clearance values on the requirements
of the largest system.
Generally, clearances (c”) should be as large as allowable.
HP StorageWorks 200 Storage Virtualization System site preparation guide
27