ACC Installation and Configuration Guide
50 Chapter2
Software Installation and Verification
Installation Verification
In the s econd e xample, both internal and external tests are performed by
using the ie test option. In this example, the loopba ck hood is not
connected to the port being tested, and therefore the external tests fail.
Example 2
ZMNTR> lb10ie
Loopback test on Mux 01 port 0, zlu 0710
Loopback protocol functionality .. OK
RS232 RTS/CTS internal loopback .. OK
RS232 RTS/CTS external loopback .. Test failed (RTS/CTS)
RS232 DTR/DCD internal loopback .. OK
RS232 DTR/DCD external loopback .. Test failed (DTR/DCD)
RS232 DTR/DSR external loopback .. Test failed (DTR/DCD)
ISCC data loopback test .......... OK
RS232 internal data loopback ..... OK
RS232 external data loopback ..... Data test timed out
For a 4-port E1/T1 Mux card, the results of these same test would appear
as follows:
ZMNTR> lb10i
Internal loopback on card 1 port 0 :Passed
ZMNTR> lb10ie
Internal loopback on card 1 port 0 :Passed
Loopback message lost
External loopback on card 1 port 0 :Failed
ZMNTR> exit










