HP Virtual Connect Fibre Channel Networking Scenarios Cookbook

79
Physical view of a Direct-Attach configuration
Figure 52: Virtual Connect Flat SAN with VC FlexFabric modules for HP 3PAR Storage Systems,
Redundant paths - Server-to- Direct-Attach uplink ratio 16:1
Enclosure
UID
Enclosure Interlink
PS
3
PS
2
PS
1
PS
6
PS
5
PS
4
OA1 OA2
Remove management modules before ejecting sleeve
FAN
6
FAN
10
FAN
1
FAN
5
2
1
3
5
7
4
6
8
iLO
UID
Active
Reset
iLO
UID
Active
Reset
HP V C F le xF abr ic 10 Gb /2 4-P or t Mod ul e
SHAR ED : U PL I NK o r X -L I NK
X3 X4X1 X2 X5 X6 X7 X8
UID
HP V C F le xF abr ic 10 Gb /2 4-P or t Mod ul e
SHAR ED : U PL I NK o r X -L I NK
X3 X4X1 X2 X5 X6 X7 X8
UID
Console Unit
5 6 15 1613 1411 129 107 81 2 3 4 21 22 31 3229 3027 2825 2623 2417 18 19 20 37 38 47 4845 4643 4441 4239 4033 34 35 36
Series
100%
80%
60%
40%
20%
49 525150
RPS
PWR
10/100Base-TX 1000Base-X
H3C S 360 0
Speed:Green=100Mbps,Yellow=10Mbps
Duplex:Green=Full Duplex,Yellow=Half Duplex Power:Green=DeliveringPower,Yellow=Fault,Flashing Green=Over Budget
Green=Speed
Mode
Yellow=Duplex
Flashing=PoE
LAN Switch A
LAN Switch B
SUS-1
SUS-2
Ethernet uplink
connection
Console Unit
5 6 15 1613 1411 129 107 81 2 3 4 21 22 31 3229 3027 2825 2623 2417 18 19 20 37 38 47 4845 4643 4441 4239 4033 34 35 36
Series
100%
80%
60%
40%
20%
49 525150
RPS
PWR
10/100Base-TX 1000Base-X
H3C S 360 0
Speed:Green=100Mbps,Yellow=10Mbps
Duplex:Green=Full Duplex,Yellow=Half Duplex Power:Green=DeliveringPower,Yellow=Fault,Flashing Green=Over Budget
Green=Speed
Mode
Yellow=Duplex
Flashing=PoE
Ethernet uplink
connection
HP BladeSystem c7000
HP 3PAR StoreServ 10400
SAN uplink
connections
(Direct-Attach)
Controller Node 0
Controller Node 1
Requirements
This configuration with Virtual Connect FlexFabric requires:
Two VC Direct-Attach SAN fabrics.
At least two VC FlexFabric modules.
A minimum of two VC fabric uplink ports connected to the 3PAR Controller nodes.
For more information about implementing and configuring a 3PAR storage system, contact your HP representative
or see http://www.hp.com/go/3par
Installation and configuration
VC CLI commands
In addition to the GUI, you can complete many of the configuration settings within VC using a CLI command set. In
order to connect to VC via a CLI, open an SSH connection to the IP address of the active VCM. Once logged in, VC
provides a CLI with help menus. The Virtual Connect CLI guide also provides many useful examples. The following
scenario provides the CLI commands needed to configure each setting of the VC.
Configuring the VC FlexFabric module
With Virtual Connect FlexFabric modules, you can only use uplink ports X1, X2, X3 and X4 for Fibre Channel
connectivity.
Make the following physical connections:
Uplink ports X1on the first VC FlexFabric module to the first HP 3PAR Controller node.
Uplink ports X1on the second VC FlexFabric module to the second HP 3PAR Controller node.
See ‘Details about the 3PAR controller connectivity’ to properly connect the 3PAR V-Class controller node.