VLS9200 user guide (BW402-10009, August 2012)

see also SAN destination library or LAN/WAN
destination library
connecting, 52
import/export details, 67
managing, 52
status, 64
status of all, 64
unmanaging, 52
DHCP
deselecting, 163
selecting, 105, 162
diagnostics see VLS Critical Diagnostics Services
disaster recovery
disk array enclosure RAID volume failure, 213
node RAID volume failure, 213
operating system failure, 211
Discover Unconfigured Storage, 43
disk array enclosure
adding, 43
adding hot-spare, 124
front panel components, 189
front panel LEDs, 190
powering off, 94
powering on, 89
rack mounting, 25
rack mounting order, 22
RAID volume failure recovery, 213
rear panel buttons, 192
rear panel components, 191
rear panel LEDs, 192
specifications, 228
disk array, managing, 122
disk beaconing, 125
DNS server address, setting, 105, 162
document conventions, 217
documentation
providing feedback on, 221
domain
name setting, 105, 162
Drive Assessment Test, 72
E
Echo Copy on Source Cartridge Eject, 56
echo copy pool
availability window
start day, 57
start time, 57
window duration, 57
creating, 55
loading blank media, 59
loading media, 59
operations, 54
restoring from a physical cartridge, 58
echo copy pool policy
at end of the policy window
LAN/WAN, 57
SAN, 56
deduplication timeout, 57
echo copy on source cartridge eject, 56
priority, 57
retention days, 55
send notification if cartridge not migrated in, 56
send notification if cartridge not replicated in, 57
sizing factor, 55
source cartridge size limit, 56
start mirror of Out of Synch cartridges, 56, 57
echo copy, concepts, 49
Edit Configuration, 80
Edit Data Protector Configuration, 86
Edit LAN/WAN Replication Target Settings, 77
Edit Policy, 45
Edit Policy Window, 63
Edit Virtual Library, 116
editing
workload assessment template, 151
Eject Media, 69
electrostatic discharge
grounding methods, 14
preventing, 14, 195
email settings, 135
emergency login, 100
emulations see VLS device emulations
environmental specifications, 231
Ethernet Switch
replacing, 206
Ethernet Switch 2510–24
cabling, 37
front panel components, 184
front panel LEDs, 185
rack mounting, 37
specifications, 230
Ethernet Switch 2810–24G
front panel components, 186
front panel LEDs, 187
Ethernet Switch 6600–24G
cabling, 35
rack mounting, 32
European Union notice, 233
expansion controller
replacing, 208
Export Cartridge Details, 80
Export Log File, 80
exporting CSV data, 145
exporting data, 73
F
failover, 121
warm, 211
FC host port
changing settings, 163
Federal Communications Commission notice, 232
Fibre Channel host port, 163
changing the default settings, 107
LUN management, 109
Fibre Channel Switch
replacing, 205
Fibre Channel Switch 8/24q
rack mounting, 38
253