Hitachi Dynamic Link Manager Software Users Guide for Windows (7.6)

Alive x.x.x-xx yyyy/mm/dd hh:mm:ss 128
HDLM Driver Ver WakeupTime
Alive x.x.x-xx yyyy/mm/dd hh:mm:ss
License Type Expiration
Permanent -
KAPL01001-I The HDLM command completed normally. Operation name
= view, completion time = yyyy/mm/dd hh:mm:ss
PROMPT>
19. Use the results of the view operation to check the version of the installed
HDLM.
If x.x.x-xx is displayed in HDLM Version, the correct version of HDLM
has been installed.
20. Use the results of the view operation to check that the programs are
running properly.
If HDLM Manager, HDLM Alert Driver, and HDLM Driver are all Alive, all
the programs are running correctly.
21. Check the path information as described in
Checking the Path
Configuration on page 3-69, and make sure that you have successfully
installed HDLM in a single-path configuration.
22. Connect cables to all the HBAs to change the configuration to a multi-path
configuration.
The following figure shows a single path configuration and a multi-path
configuration.
Figure 3-3 Single Path Configuration and Multi-path Configuration
23. Check the path information as described in Checking the Path
Configuration on page 3-69 to make sure that you have successfully
assembled a multi-path configuration.
When MSCS Is Used
The following provides explanations of how to install MSCS before and after
an HDLM installation.
Creating an HDLM Environment
3-33
Hitachi Dynamic Link Manager User Guide for Windows
®