HP P9000 Tiered Storage Manager Software 7.2 CLI Reference Guide

Output items (migration task)
NOTE:
For some output items, - or Unknown is output when one of the following conditions are met:
When a storage tier created by using pool filter conditions is selected as a migration target.
Unknown is displayed until creation of the volume completes.
When the externally connected storage system is an SMI-S Enabled storage system.
- or Unknown is displayed.
Table 58 Items output by the GetTasks command (migration task) (Task instance)
DescriptionItem
The task ID.
The task ID format is TK########. The time and serial number are converted to
base 36 and displayed in the format ########.
ID
The type of task (Migration)taskType
The task status
For details on the values displayed, see Task statuses on page 168.
status
The estimated time for the task execution.
If you specify the erasedata parameter during task creation, and then execute
the task, this value will include the time to delete data.
This value is displayed in hhhh:mm:ss format.
If the estimated value is 10,000 hours or more, 9999:59:59 is displayed.
timeEstimate
The date and time when the task was created
creationTime
The execution request time and date for the task
executionRequest-
Time
The elapsed time from the starting point of the task execution.
This value is displayed in hhhh:mm:ss format.
If the elapsed time is 10,000 hours or more, 9999:59:59 is displayed. If the
elapsed time cannot be acquired, n/a is displayed. If the task is not executed,
nothing is displayed.
timeElapsed
The date and time when task execution ended
endTime
The date and time when migration execution started
migrationStarted-
Time
The date and time when migration execution completed
[migrationComple-
tionTime]
Indicates the migration progress, as a percentage. Values of less than 1% are
rounded down and displayed as an integer. (For example, 45.3% is rounded down
to 45%.)
migrationProgress
Details of CLI commands122