HP StorageWorks Disk Array XP1024: Site Preparation Guide (A7906-96013, July 2005)
Site prep team and tasks 15
Electrical Yes No Reference
9when completed
Are two AC outlets (on different lines) available for the proposed
equipment?
page 36
Does the input voltage correspond to equipment specifications? page 36
Are the input circuit breakers adequate for equipment loads? page 36
Does the input frequency correspond to equipment specifications? page 36
Are lightning arresters installed? page 51
Have all sources of electrical interferences been corrected? page 51
Air-Conditioning Yes No Reference
9 when completed
Can the temperature be maintained between 16° and 32° C? page 69
Can temperature changes be held to less that 10°C per hour? page 71
Can humidity level be maintained between 20% and 80% percent? page 71
Building Access and Security Yes No Reference
9 when completed
Is there access control to the computer room? page 27
Is there access control for the customer site? page 27
Are any stair-walkers, lifts, ramps, floor coverings, or ladders
required to install the equipment?
Define: _________________________________________
page 27
Will the equipment fit through all doors, corridors, and in lifts,
both in size and weight?
page 27
Does the building have a loading dock?
Maximum access height is _____m.
page 27