HP XP7 Getting Started Guide

Figure 10 Service clearances for a three rack system (left module)
*1 Clearance (a+b) is based on the floor load rating and the clearance (c). Floor load rating and
required clearances are shown in Table 12 (page 28).
*2 Clearance (d) is required over 300mm to open the front door. In the case that the clearance
(d) is less tan the clearance (a), give priority to clearance (a).
Table 12 Floor load rating and required clearances for a three rack configuration (left module)
Required Clearance (a+b) mFloor Load
Clearance (c) mRating
(kg/m2)
C=1.4C=1.0C=0.8C=0.6C=0.4C=0.2C=0C=-0.3
00000000Over 700
00000000600
000000.10.20.5500
0000.10.20.40.50.9450
00.20.30.40.60.81.01.3400
0.40.60.80.91.11.31.62.0350
1.01.31.51.72.02.22.63.1300
Notes:
28 Installation requirements