HP XP7 Getting Started Guide

Figure 12 Service clearances for a four rack system (left module)
*1 Clearance (a+b) is based on the floor load rating and the clearance (c). Floor load rating and
required clearances are shown in Table 14 (page 31).
*2 Clearance (d) is required over 300mm to open the front door. In the case that the clearance
(d) is less tan the clearance (a), give priority to clearance (a).
Table 14 Floor load rating and required clearances for a four rack configuration (left module)
Required Clearance (a+b) mFloor Load
Clearance (c) mRating
(kg/m2)
C=1.4C=1.0C=0.8C=0.6C=0.4C=0.2C=0C=-0.3
00000000Over 700
00000000.1600
000000.20.40.8500
000.10.20.40.60.81.3450
0.10.30.50.70.91.11.41.9400
0.60.91.21.41.61.92.32.9350
1.51.92.22.52.83.23.64.4300
Notes:
System specifications and requirements 31