HP XP7 Getting Started Guide

*3 Clearance (e) is required over 200mm to open the rear door. If clearance (e) is less than
clearance (b), give priority to clearance (b).
Table 15 Floor load rating and required clearances for a four rack configuration (right module)
Required Clearance (a+b) mFloor Load
Clearance (c) mRating
(kg/m2)
C=1.4C=1.0C=0.8C=0.6C=0.4C=0.2C=0C=-0.3
00000000Over 700
00000000.1600
000000.20.40.8500
000.10.20.40.60.81.3450
0.10.30.50.70.91.11.41.9400
0.60.91.21.41.61.92.32.9350
1.51.92.22.52.83.23.64.4300
Notes:
1. Actual clearances for installation should be determined after consulting with construction specialist responsible for
installation building, as they could vary depending on the size/layout of the system and building conditions.
2. When various configurations of disk arrays are arranged in a row, clearance values based on the largest disk
array configuration should be used.
3. From the viewpoint of maintenance operations, it is suggested that Clearance (c) be made as large as possible.
Five rack configuration
This following figure and table shows the service clearances and floor load rating for a five-rack
configuration.
System specifications and requirements 33