HP XP7 Getting Started Guide

Figure 14 Service clearances for a five rack system
*1 Clearance (a+b) is based on the floor load rating and the clearance (c). Floor load rating and
required clearances are shown in Table 16 (page 34).
*2 Clearance (d) is required over 300mm to open the front door. In the case that the clearance
(d) is less tan the clearance (a), give priority to clearance (a).
Table 16 Floor load rating and required clearances for a five rack configuration
Required Clearance (a+b) mFloor Load
Clearance (c) mRating
(kg/m2)
C=1.4C=1.0C=0.8C=0.6C=0.4C=0.2C=0C=-0.3
00000000Over 700
00000000600
000000.10.30.8500
0000.10.30.60.91.4450
00.30.50.70.91.21.62.2400
0.61.01.21.51.82.22.63.3350
34 Installation requirements