HP Smart Array Cluster Storage System

Installation and Operation
2-2 HP Smart Array Cluster Storage System User Guide
HP CONFIDENTIAL
Writer: Rob Weaver File Name: c-ch2 Installation and Operation
Codename: Aurora Part Number: 240333-003 Last Saved On: 11/6/02 1:03 PM
Warnings
WARNING: To reduce the risk of personal injury or damage to the equipment,
be sure that:
The leveling jacks are extended to the floor.
The full weight of the rack rests on the leveling jacks.
The stabilizing feet are attached to the rack if it is a single-rack installation.
The racks are coupled together in multiple-rack installations.
Only one component is extended at a time. A rack may become unstable if
more than one component is extended for any reason.
WARNING: To reduce the risk of personal injury or equipment damage when
unloading a rack:
At least two people are needed to safely unload the rack from the pallet. An
empty 42U rack can weigh as much as 115 kg (253 lb), can stand more than
2.1 m (7 ft) tall, and may become unstable when being moved on its casters.
Never stand in front of the rack when it is rolling down the ramp from the
pallet. Always handle the rack from both sides.
Shipping Contents
Unpack the system shipping carton and locate the materials and documentation
necessary for installing the system. All the rack mounting hardware necessary for
installing the system into the rack is included with the rack or the system.