Installation manual

4
Pre-installation checklist
Item Re
q
uirements
Yes No
Installation
site
Ventilation
There is a minimum clearance of 10 cm (3.9 in) around
the router chassis intake and exhaust vents for heat
dissipation.
The installation site ventilation system is adequate.
Temperature 0°C to 40°C (32°F to 104°F)
Relative humidity 5% to 90% (noncondensing)
Cleanness Dust concentration 3 × 10
4
particles/m
3
ESD prevention
The equipment and floor are correctly grounded.
The equipment room is dust-controlled.
Humidity and temperature are maintained at acceptable
levels.
Wear an ESD wrist strap when inspecting or handling a
circuit board.
EMI prevention
Take measures to protect the power system from the
power grid system.
Keep the protection ground of the router as far away from
the grounding device or lightning protection grounding
device as possible.
Keep the router far away from radio transmitters, radar,
and high-frequency or high-voltage devices.
Use electromagnetic shielding when necessary.
Lightning protection
The grounding cable of the chassis is grounded correctly.
The grounding terminal of the AC power receptacle is
grounded correctly.
A port lightning arrester is installed. (Optional.)
A power lightning arrester is installed. (Optional.)
A signal lightning arrester is installed at the input end of
an external signal cable. (Optional.)
Electricity safety
Install a UPS.
In case of emergency during operation, switch off the
external power switch.
Workbench
The workbench is stable.
The workbench is grounded correctly.
Safety
precautions
The router is far away from any sources of heat or moisture.
The emergency power switch in the equipment room is identified and accessible.
Installation
accessories
and tools
Installation accessories supplied with the router are ready.
User-supplied accessories and tools are ready.
Reference
Documents shipped with the router are available.
Online documents are available.