Manual

Chapter 6 Maintenance Processes
140
Figure 6-19. Shutdown Dialog Box Functions
WARNING It is the user’s responsibility to ensure all host I/O has stopped
before powering off the system.
3. Click the Prepare for Shutdown button on the Shutdown dialog box.
A check mark should appear in the check box next to Preparing for
Shutdown under Controller Status.
4. If necessary, click the Refresh button occasionally to check status.
5. Wait for a check mark to appear in the Ready to Power Off check box
before continuing.
6. Only after a check mark appears in the Ready to Power Off check box may
you shut down the system.
7. If you choose not to power down the system at this time, select Return to
Normal Operation before continuing.
NOTE If using duplex or Dual Active mode, it is only necessary to
prepare one of the FCArray Controllers for shutdown.
Preparing one controller for shutdown also prepares the other
controller for shutdown. The waiting time for one controller
affects the other controller as well.