Owner's manual

5157/5157 ACL S-Series DLT Subsystems Installation/Users Guide
Unpacking and Installing the 5157/5157 ACL Tape Subsystem
2-8
7. Check the leveling pads before moving the enclosure stack
(refer to Figure 2-7).
Figure 2-7 The operation of the leveling pads
8. With one person on each side of the subsystem, slowly guide it off the
pallet (refer to Figure 2-8). The platforms are on casters, allowing it to
be moved easily down the ramp and into position.