Owner's manual

Replace
Launches the Replace PMF guided procedure, which provides step-by-step instructions for replacing the PMF CRU.
Storage ASIC Initialization Test
Prompts the storage subsystem manager process ($ZZSTO) to initialize the storage ASIC in the CRU. If initialization
fails, an alarm is generated.
This action is triggered automatically when a new CRU is inserted while OSM is running or when an (SCF) STATUS
ADAPTER command is issued. If a CRU is inserted while OSM is not running, perform this action after logging on to
the OSM Service Connection.
Test Verify
Performs basic tests on the CRU.You can perform this action when the CRU is online.
PMF (Processor Multifunction) 169