Service and Maintain

Periodic maintenance 63
Periodic maintenance
Periodic maintenance overview
Perform periodic inspections on the components in this section to ensure that the HP POD 40c G2 continues
to perform within the designed parameters.
Cooling system maintenance schedule
Component to be inspected Task Frequency Capable Party
Air filters
Inspect and replace as necessary
As needed
HP and certified
facilities personnel
Air filter differential pressure
switch
Inspect and test, replace as
necessary
Annually HP and certified
facilities personnel
Condensate drain lines and
p-trap
Inspect and clean or blowout
p-trap and lines as necessary
Quarterly HP and certified
facilities personnel
Condensate drain pans
Inspect pans:
Free of debris
No leaks
Leakage detectors are in
proper position
Drain line is open
Water can pass through freely
Condensate traps are filled
with water
Clean pans as necessary
Quarterly HP and certified
facilities personnel
Drain pan sensors
Inspect and test, replace as
necessary
If a leak is detected, see "Leak
detection maintenance (on page
64)."
Quarterly HP and certified
facilities personnel
Conduct visual inspection for
leakage during the air filter
checks
Inspect and clean as necessary Quarterly HP and certified
facilities personnel
Heat exchanger fans
Inspect wiring and verify that
electrical components are secure
and fan power supplies are locked
into position
Quarterly HP and certified
facilities personnel
Humidifier (if installed)
Inspect for water leaks, verify that
no sparks form between the
electrodes during operation, and
inspect the general operation of
the cylinder.
Bi-weekly HP and certified
facilities personnel
Put the humidifier in system flush
mode and inspect drain flow and
water supply flow. Inspect, clean,
and/or replace as necessary.
Quarterly HP and certified
facilities personnel