Specifications
Removal and Replacement Procedures
Hot-Plug Procedures
You can perform hot-plug procedures without powering down the server. Before performing
hot-plug procedures, observe the following guidelines:
•
•
•
For hot-plug fan procedures, be sure that the fan zone is fully populated.
For hot-plug power supply procedures, be sure that a redundant power supply is installed.
For hot-plug drive procedures, determine whether the drive is part of an array. For
guidelines on hot-plug SCSI hard drive replacement, refer to the Servers Troubleshooting
Guide.
HP ProLiant ML370 Generation 3 Server Maintenance and Service Guide 2-11
HP CONFIDENTIAL Codename: Plucky Duck Part Number: 281778-004 Last Saved On: 7/9/03 9:19 AM










