Manual
Hardware options installation 54
WARNING: To reduce the risk of electric shock or damage to the equipment, do not connect the
power cord to the power supply until the power supply is installed.
4. Install the redundant power supply into the bay until it clicks.
5. Connect the power cord to the power supply.
6. Use the strain relief clip from the server hardware kit to secure the power cord.
7. Route the power cord through the cable management solution.
8. Connect the power cord to the power source.
9. Be sure that the power supply LED is green.
Installing the 8X SFF Smart Array enablement option
1. Power down the server (on page 15).
2. Disconnect all peripheral cables from the server.
3. Remove the server from the chassis (on page 15).