User's Manual

26481a
20
21
22
23
0
Figure 5 Installing the Brocade 8Gb SAN Switch into an interconnect bay
5. Press the installation handle into the latch to lock the Brocade 8Gb SAN Switch in place.
CAUTION:
All panels and doors should be in place a nd securely fastened while the un i t is in operation, for proper
cooling and for EMI emissions control.
OA power verication
As dened e arlier, the HP BladeSystem Onboard Administrator (OA) is the enclosure management
processor that manages the d evices contained within the enclosure. The OA provides a single p oint from
which to p er form basic m anagement tasks on switches or server blades i nstalled in the enclosure.
IMPORTANT:
HP recommend s reading the appropriate
HP BladeSystem Enclosure User Guide
and the
HP BladeSystem
Onboa rd Administrator User Guide
. Reading these guides in sequence will promote an overall understanding
of your specicenclosuremodel.
Once the switch is installed in the interconnect bay, the OA veries that the switch t ype matches the
mezzanine cards present on the servers. If there is no mismatch, the OA powers up the switch.
If the switch does not power up, check the enclosure and switch status with the OA web interface. Refer to
the HP BladeSystem O nboa rd Administrator User Guide.
Check L
EDs
See Figure 6 to locate power-on LEDs. Verify that the LEDs match the indicators described in Table 1 0.
22 Setup