HP LaserJet Managed MFP E72525, E72530, E72535, E77822, E77825, E77830 - On-Site Installation Guide
Staging checklists
NOTE: Stagers must take appropriate training and download and utilize all installation guides in order to do the
following steps correctly. Staging is typically performed at an o site location.
NOTE: Assemblers must be trained and qualied/certied to perform this activity.
Table 5-1 Staging (minimum 30 min + options)
❑
Unbox and inventory miscellaneous items – 2 or 4 person lift (10 mins).
❑
Unbox the tray or cabinet (5 mins).
❑
Unbox the engine (5 mins).
❑
Place the engine on the lower accessory, if ordered – 2 or 4 person lift (2 mins).
❑
Y1G24A must be used on the E72525, E72530, E72535 mono series when Stapler/Stacker Finisher or Booklet Finisher are used.
❑
Remove the shipping tape and scanner lock (5 mins).
❑
Unpackage and install the toner cartridge(s) (2 mins).
Table 5-2 Assembly and testing (minimum 55 mins + options)
❑
Attach the paper handling or other accessories (based on conguration).
❑
Install the imaging unit(s) (5 mins).
❑
Adjust the tray paper guides to the appropriate size for the account.
❑
Load the paper trays and lock the rear guides (5 mins).
❑
Connect the power and LAN cables then turn on the main switch (1 min).
❑
Power on and wait for the initial screen (2 mins).
❑
Perform the Late Point Dierentiation Conguration (LPDC) (3 min).
NOTE: LPDC will be automatically set up after power on. If this fails or internet not available, the LPDC information will need to
installed manually.
❑
Select a language and set the date/time (1 min).
❑
Update to latest rmware (up to 20 min).
CAUTION: All accessories need to be attached before updating rmware. After installing any accessory the rmware must be
updated to make sure the printer rmware is compatible with the accessory.
❑
Print the conguration and demo pages (2 min).
❑
Perform a basic functionality test (10 minutes) – test print, copy, and each accessory.
❑
Disassemble the accessories and prepare the printer for transportation (3 min).
30 Chapter 5 Staging ENWW










