User Manual

Table Of Contents
8. Route and connect the data cable.
9. If needed, install an optical drive (Installing an 8 SFF optical drive on page 62).
10. Install the access panel (Installing the access panel on page 31).
11. Install the server in the rack.
12. Connect each power cord to the server.
13. Connect each power cord to the power source.
14. Power up the server (Power up the server on page 30).
Installing the 4 LFF optical drive option
Prerequisites
Before installing this option, be sure that you have the following:
Hardware options installation 73