User Manual

Table Of Contents
8. Install the access panel (Installing the access panel on page 31).
9. Install the server in the rack.
10. Connect each power cord to the server.
11. Connect each power cord to the power source.
12. Power up the server (Power up the server on page 30).
Installing the serial cable option
Prerequisites
Before installing this option, be sure you have the following:
The components included with the hardware option kit
5 mm socket
Procedure
1. Observe the following alerts:
WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives and the internal
system components to cool before touching them.
CAUTION: To prevent damage to electrical components, properly ground the server before
beginning any installation procedure. Improper grounding can cause electrostatic discharge.
2. Back up all server data.
3. Power down the server (Powering down the server on page 30).
4. Remove all power:
Hardware options installation 119