User Manual
Table Of Contents
- HPE ProLiant DL160 Gen10 Server User Guide
- Contents
- Important product information
- Component identification
- Setup
- Operations
- Power up the server
- Powering down the server
- Extend the server from the rack
- Access the product rear panel
- Remove the server from the rack
- Removing the front bezel
- Remove the access panel
- Installing the access panel
- Removing the primary PCI riser blank
- Installing the primary PCI riser blank
- Removing the primary PCI riser cage
- Installing the primary PCI riser cage
- Removing the secondary PCI riser cage
- Installing the secondary PCI riser cage
- Removing the expansion slot blank
- Removing and replacing a drive blank
- Hardware options installation
- Introduction
- Installing the front bezel option
- Redundant power supply enablement option
- Power supply options
- Memory options
- Drive options
- Installing a two-bay SFF enablement kit
- Installing the Slim SSD enablement kit
- Redundant fan option
- Installing the optical drive
- Installing the Media Module
- Installing the FlexibleLOM
- Installing the serial port
- Expansion board options
- Storage controller options
- Processor heatsink assembly option
- Installing the Chassis Intrusion Detection switch
- Smart Storage Battery option
- M.2 SSD enablement option
- HPE Trusted Platform Module 2.0 Gen10 option
- Cabling
- Software and configuration utilities
- Troubleshooting
- System battery replacement
- Specifications
- Safety, warranty, and regulatory information
- Websites
- Support and other resources
System battery replacement
System battery information
The server contains an internal lithium manganese dioxide, a vanadium pentoxide, or an alkaline battery
that provides power to the real-time clock. If this battery is not properly handled, a risk of the fire and
burns exists. To reduce the risk of personal injury:
• Do not attempt to recharge the battery.
• Do not expose the battery to temperatures higher than 60°C (140°F).
• Do not disassemble, crush, puncture, short external contacts, or dispose the battery in fire or water.
• If the server no longer automatically displays the correct date and time, then replace the battery that
provides power to the real-time clock. Under normal use, battery life is 5 to 10 years.
Removing and replacing the system battery
Procedure
1. Back up all server data.
2. If installed, remove the bezel.
3. Power down the server.
4. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
5. Disconnect all peripheral cables from the server.
6. Do one of the following:
• Extend the server from the rack.
• Remove the server from the rack.
7. Remove the access panel.
8. Locate the battery.
9. Remove the battery.
System battery replacement 127