User Manual

Table Of Contents
12. Install the redundant power supply cage.
13. Install the rail.
14. Install the access panel.
15. Install the server into the rack.
16. Install a hot-plug power supply in power supply bay 1.
17. If enabling power redundancy in the server, install a second power supply in power supply
bay 2.
18. Power up the server on page 36.
19. If removed, install the bezel.
The installation is complete.
52 Hardware options installation