User Manual

Table Of Contents
Power supply options
Depending on the installed options and the regional location where the server was purchased, the server
can be configured with one of the following power supplies.
Hot-plug power supply calculations
For hot-plug power supply specifications and calculators to determine electrical and heat loading for the
server, see the Hewlett Packard Enterprise Power Advisor website (http://www.hpe.com/info/
poweradvisor/online).
Installing a hot-plug AC power supply
Procedure
1. Access the product rear panel.
2. Remove the power supply blank.
3. Slide the power supply into the bay until it clicks into place.
4. Connect the power cord to the power supply.
5. To prevent accidental power cord disconnection when sliding the server in and out of the rack, secure
the power cord in the strain relief strap attached to the power supply handle:
a. Unwrap the strain relief strap from the power supply handle.
Hardware options installation 53