User Manual
Table Of Contents
- HPE ProLiant DL160 Gen10 Server User Guide
- Contents
- Important product information
- Component identification
- Setup
- Operations
- Power up the server
- Powering down the server
- Extend the server from the rack
- Access the product rear panel
- Remove the server from the rack
- Removing the front bezel
- Remove the access panel
- Installing the access panel
- Removing the primary PCI riser blank
- Installing the primary PCI riser blank
- Removing the primary PCI riser cage
- Installing the primary PCI riser cage
- Removing the secondary PCI riser cage
- Installing the secondary PCI riser cage
- Removing the expansion slot blank
- Removing and replacing a drive blank
- Hardware options installation
- Introduction
- Installing the front bezel option
- Redundant power supply enablement option
- Power supply options
- Memory options
- Drive options
- Installing a two-bay SFF enablement kit
- Installing the Slim SSD enablement kit
- Redundant fan option
- Installing the optical drive
- Installing the Media Module
- Installing the FlexibleLOM
- Installing the serial port
- Expansion board options
- Storage controller options
- Processor heatsink assembly option
- Installing the Chassis Intrusion Detection switch
- Smart Storage Battery option
- M.2 SSD enablement option
- HPE Trusted Platform Module 2.0 Gen10 option
- Cabling
- Software and configuration utilities
- Troubleshooting
- System battery replacement
- Specifications
- Safety, warranty, and regulatory information
- Websites
- Support and other resources
• Smart Array modular controller option
• Compatible controller cable option
• T-15 Torx screwdriver
Before you perform this procedure, perform the following steps:
1. Back up data on the system.
2. Close all applications.
3. Update the server firmware if it is not the latest revision.
4. Do one of the following:
• If the new Smart Array is the new boot device, install the device drivers.
• If the new Smart Array is not the new boot device, go to the next step.
5. Ensure that users are logged off and that all tasks are completed on the server.
CAUTION: In systems that use external data storage, be sure that the server is the first unit to be
powered down and the last to be powered back up. Taking this precaution ensures that the system
does not erroneously mark the drives as failed when the server is powered up.
Procedure
1. Observe the following alerts:
WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives and the
internal system components to cool before touching them.
CAUTION: To prevent damage to electrical components, properly ground the server before
beginning any installation procedure. Improper grounding can cause electrostatic discharge.
2. Back up all server data.
3. If installed, remove the bezel.
4. Power down the server.
5. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
6. Disconnect all peripheral cables from the server.
7. Do one of the following:
• Extend the server from the rack.
• Remove the server from the rack.
8. If installed, remove the secondary PCI riser cage.
Hardware options installation 79