User Manual

Table Of Contents
Slot 3
If installing the M.2 SSD enablement board in slot 3, a type-a modular storage controller is not
supported in the server.
13. Install the primary PCI riser cage.
14. Route and connect the cables.
15. Install the access panel.
16. Install the server into the rack.
17. Connect all peripheral cables to the server.
18. Connect each power cord to the server.
19. Connect each power cord to the power source.
92 Hardware options installation