Instructions / Assembly
Table Of Contents
- Part 1 - General Safety Information
- Part 2 - Before You Start
- Part 3 - Prepare the Boiler
- A. Locating the Boiler
- B. Structure
- C. Leveling
- D. Clearances for Service Access
- E. Wall Mounting Considerations
- F. Wall Mounting Instructions
- G. Residential Garage and Closet Installations
- H. Exhaust Vent and Intake Pipe
- I. Carbon Monoxide Detectors
- J. Prevent Combustion Air Contamination
- K. Removing a Boiler from a Common Vent System
- K. Water Chemistry Requirements*
- L. Technical Specifications
- Part 4 - Piping
- A. General Plumbing Information
- B. Relief Valve
- C. Backflow Preventer
- D. Potable Expansion Tank
- E. Circulators
- F. Hydronic Piping with Circulators, Zone Valves, and Multiple Boilers
- G. Circulator Sizing
- H. Check / Control Water Chemistry
- I. Plumbing
- J. Fill and Purge Heating System
- K. Glycol Antifreeze Solutions
- L. Zoning with Zone Valves
- M. Zoning with Circulators
- N. Multiple Boilers
- O. Applications*
- Part 5 - Venting
- Part 6 - Condensate Removal
- Part 7 - Wiring
- A. Installation Must Comply With
- B. Field Wiring Terminations
- C. Field Wiring
- D. Line Voltage Wiring for Standard Boiler
- E. Alarm Connections
- F. Low Voltage Connections for Standard Boiler
- G. Thermostat
- H. Outdoor Sensor
- I. Indirect Sensor
- J. Optional 0-10 Volt Building Control Signal
- K. Optional UL353 Low Water Cut-Off Interface Kit
- L. Wiring of Cascade System Communication Bus
- M. Cascade Master Pump and Sensor Wiring
- N. Cascade Follower Pump and Sensor Wiring
- Part 8 - Gas Connections
- Part 9 - Start-Up Preparation
- A. Check / Control Water Chemistry
- B. Check for Gas Leaks
- C. Freeze Protection (When Used)
- D. Fill and Test Water System
- E. Purge Air from Water System
- F. Check Thermostat Circuit(s)
- G. Condensate Removal
- H. Final Checks Before Starting Boiler
- I. Setting Up a Single Boiler
- J. Setting Up a Cascaded System
- K. Lockout Condition
- L. Cascade System Programming
- Part 10 - Start-Up Procedure
- Part 11 - Start-Up Procedures for the Installer
- Part 12 - Troubleshooting
- Part 13 - Maintenance
- Part 14 - Shutdown
- Part 15 - Installation Checklist
- Part 16 - Maintenance Report
- Part 17 - Replacement Parts

LP-387 Rev. 011 Rel. 006 Date 6.28.19
23
NOTES:
1. This drawing is meant to show system piping concept only. Installer is responsible for all equipment and detailing required by local codes.
2. All closely spaced tees shall be within 4 pipe diameters center to center spacing.
3. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream of all closely spaced tees.
4. The minimum pipe size for connecting an indirect water heater is 1”
5. The minimum pipe size for connecting a 55 or 80 model boiler - 1”.
6. Circulators are shown with isolation anges. The alternative is standard anges with full port ball valves. Purge valves can be used with
circulator anges as an alternative.
7. A mixing valve is recommended if the DHW temperature is set above the factory setting of 119
o
F.
8. Piping shown is Standard. VERY IMPORTANT: Minimum ow rates outlined in the manual must be maintained to minimize short cycling.
9. Install a minimum of 12 diameters of straight pipe upstream of all circulators.
10. VERY IMPORTANT – Minimum ow rates outlined in this manual must be maintained through the heat exchanger to minimize short
cycling.
The piping will not support the weight of the circulators. Refer to the circulator manufacturer’s instructions to properly support the circulator.
Failure to comply with these instructions could result in property damage, severe personal injury, or death.
Figure 10 - Standard Piping with Zone Valves and Indirect Priority